Elteknikgruppen i Mälardalen AB · Bålsta
Elteknikgruppen i Mälardalen: 420 kW battery storage
Elteknikgruppen i Mälardalen chose WeCo batteries and the KanEL platform for a 420 kW and 860 kWh battery storage system.
- WeCo
- Installer

420 kW · 860 kWh
Power and energy capacity
“It wasn't just about installing a battery — it was about choosing a solution that works technically, commercially, and long-term. With Italian WeCo we get robust and reliable technology. With KanEL we get a platform that activates the installation on the market and creates real value. What made the difference was the commitment and competence — from design to operations. We're not just building energy storage. We're building solutions that strengthen the grid and the business over time.”
Outcome
The KanEL platform runs the battery storage on ancillary services and the power market.